Keesler Medical Center

Biloxi, Mississippi

Hurricane Katrina gave this hospital the reason and the resources to upgrade its thirty-five-year-old, 18,000 square foot dietary department to bring it up and into the twenty-first century. Fortunately, because new equipment could be integrated into the existing utility infrastructure, the fast-track schedule was met to the satisfaction of the U.S. Army Corps of Engineers.

Related Work

Design

NMAAHC

The National Museum of African American History & Culture, the latest addition to the Smithsonian Institution. Philip Freelon and David Adjaye, winners of the international competition to design this new museum on the National Mall, have ensured that first-rate dining can be part of the visitor’s experience within their eye-catching edifice.

Design

U.S. Embassy, Istanbul

This new $25 million facility is the first of more than 20 State Department Bureau of Overseas Building Operations’ projects with HOPKINS that make use of various teams and an array of contracting methods. Built with ZGF on a hilltop overlooking the Bosporus, the new embassy is surrounded by a landscape planted with plenty of figs and grapes. No one goes hungry on this hill.

Design

Camp Lemonier

As a consultant to URS Corporation, HOPKINS designed a new 25,000 square foot dining hall to serve up to 3,000 soldiers 22 hours a day. When the budget for this project was slashed, HOPKINS was sent to Djibouti to survey surplus foodservice equipment in storage to identify pieces that could be salvaged to allow the project to proceed through construction.