MIT, William Sloan School of Management

Cambridge, Massachusetts

The Beyer Blinder Belle addition of a new penthouse floor, along with a complete gut-renovation of the Building E-52 conference center, will increase the number of events the building can host and the corresponding revenues gained. HOPKINS’ scope included renovation of a large production kitchen and a remote full-service bake shop, to which we added a third finishing kitchen on the penthouse level and catering pantries near all conference rooms.

Related Work

Design

Fort Bliss Replacement Hospital

This HDR-designed hospital takes advantage of new technologies in food service equipment design to offer the perks of at-your-service, hotel-style dining to our nation’s military.

Design

Keesler Medical Center

Hurricane Katrina gave this hospital the reason and the resources to upgrade its thirty-five-year-old, 18,000 square foot dietary department to bring it up and into the twenty-first century. Fortunately, because new equipment could be integrated into the existing utility infrastructure, the fast-track schedule was met to the satisfaction of the U.S. Army Corps of Engineers.