MIT, William Sloan School of Management

Cambridge, Massachusetts

The Beyer Blinder Belle addition of a new penthouse floor, along with a complete gut-renovation of the Building E-52 conference center, will increase the number of events the building can host and the corresponding revenues gained. HOPKINS’ scope included renovation of a large production kitchen and a remote full-service bake shop, to which we added a third finishing kitchen on the penthouse level and catering pantries near all conference rooms.

Related Work

Design

World Bank - Workplace

After the Bank purchased a building near its landmark KPF-designed headquarters, the Studios architectural firm hired HOPKINS to insert a full-service cafeteria on a particularly short floor. The new building’s cafe had to be at least as good as the one at headquarters. Challenge met! With extraordinary engineering skill, HOPKINS shoehorned the full-service cafeteria into the space. The client was delighted.

Design

Federal Bureau of Prisons

This $112 million design–build project with Arrington Watkins and AECOM houses 960 high-security inmates along with an adjacent minimum security component for an additional 128 inmates. HOPKINS also designed the laundry operation.

Design

NMAAHC

The National Museum of African American History & Culture, the latest addition to the Smithsonian Institution. Philip Freelon and David Adjaye, winners of the international competition to design this new museum on the National Mall, have ensured that first-rate dining can be part of the visitor’s experience within their eye-catching edifice.